The Fairview Terminal Phase 2A Expansion Project added a second vessel berth and expanded the container terminal’s annual throughput capacity from 850,000 to 1.35 million TEUs.
The northern berth was extended by 155m in length and 40m in width, and the seabed was dredged to ensure sufficient depth. It also added three new big ship-ready Malacca-max cranes for servicing the second berth. The terminal was expanded by 11ha to increase the speed of services, while the on-dock rail space was extended by 6,000ft.
Adventure Construction, under contract to Bel Pacific, provided all aggregates and asphalt paving on the expanded container yard. Key challenges on this project included design of the sub-base and the asphalt mix design for point load bearing capacity, and tight schedule constraints for port operations.